Customary Workday Projects:
- clean ditches and sluice pipes along club road
- dock/floating dock deployment…completed
- mow both sides of dam area…done 5/31
- common grounds raking/cleanup
Additional Projects:
- shooting range general cleanup, remove debris (tattered target stands/targets)
- repair tattered target stands that were designed for (2’ x 4’) plywood replacement but frame damaged…repair pending
- install posts with reflectors to mark end of slice pipes at range entry
- Picnic pavilion gables are weather worn and need professional replacement however, they can be painted (lakeside and opposite side) to hold for another year
- clean/straighten out hemlock grove behind clubhouse by existing wood storage shed
- Existing fire-pit area
- fire-pit can be enlarged (stone available)
- possible Fall Workday project is to move existing wood storage shed to somewhere closer to fire-pit
- another Fall workday project is to split wood left over from ramp install and stock woodshed
- Paint/stain all picnic tables…check with Kirk Moyer for best product and color
- Paint/stain all outdoor wood on clubhouse (front steps, steps to balcony, and balcony… check with Kirk Moyer for best product and color
Many projects are ongoing throughout the year (ie. Grass cutting at the dam). If there is NOT something on this list where you have seen a need, either let me know and I can add to the list OR, DIY and let me know what was done. Feel free to contact me for any questions related to LUNC work projects
Tim Westgate 302 381-9060 westgatede@verizon.net